As per the email sent on the 29th April (pasted below) maintenance will go ahead as planned at 1pm today, any issues or updates required will be placed here:

email:

Due to the recent issues with STOR2 some upgrades to the physical host node are planned, increased memory and a new storage controller cache are to be fitted on the 10th May 2019 at 1PM London time.

It is not expected to take much more than 15 minutes to complete the upgrade however due to shutdowns and startup times an hour I being booked in.

Disruption will be kept to a minimum however to shutdown and restart is required.

This will ensure the long term hands off stability that is required for any storage server.

Thank you for your understanding and patience.

Anthony.

Inception Hosting Limited.



Friday, May 10, 2019